Skip to main content

Table 1 Outline of G plant in this study

From: Effect of seasonal variations of organic loading rate and acid phase on methane yield of food waste leachate in South Korea

 

Treatment material

Digestion method

Volume of digester

Design capacity

HRT

G bio-gasification facility (G plant)

FWL

Wet type, high temperature, two-stages

4830 m3

259 ton/day

24.1 day